ABOUT PURPLE LINE TRANSIT CONSTRUCTORS          

PROJECT INFO

RESPONSE DUE BY 12PM ET ON JANUARY 8, 2018

ATTENTION MD CONTRACTING COMMUNITY AND MDOT CERTIFIED DBEs:

Purple Line Transit Constructors (PLTC) seeks qualified firms for the following work package opportunities:

RFP #PLT4-C-116 Soldier Pile & Lagging Walls:

  • Furnish & install Soldier Pile & Lagging (SPL) Walls which include approximately 76,200 SF across 20 separate walls.
  • Design SPL Walls taking into consideration design life requirements and corrosion protection requirements. All designs shall be signed and sealed by a professional engineer licensed in the State of Maryland.
  • Furnish and place caissons, including but not limited to rebar cages, precast lagging, drain board, Cast-in-Place facing and all other associated accessories.
  • Furnish and install a PVC pipe outlet wrapped in waterproofing membrane at each drain board.
  • Apply surface treatment to CIP facing.

If your firm is capable of performing the furnish and installation of this scope and would like to be considered, please follow the steps below to submit your notice of interest.

Step 1: Get or Update Your DBE Certification

Step 2: Submit Your Notice of Interest by the Due Date

Once your Notice of Interest is submitted, you will receive an email confirmation.

Step 3: Respond to PLTC Follow Up Emails/Phone Calls